runScope, runKey, workflowStatus, totalSteps, stepsCompleted, lastStep, nextStep, inputDocuments, lastSaved
runScope runKey workflowStatus totalSteps stepsCompleted lastStep nextStep inputDocuments lastSaved
epic-level epic-4 completed 5
step-01-detect-mode
step-02-load-context
step-03-risk-and-testability
step-04-coverage-plan
step-05-generate-output
step-05-generate-output
_bmad-output/planning-artifacts/epics.md
_bmad-output/test-artifacts/test-design-architecture.md
_bmad-output/test-artifacts/test-design-qa.md
_bmad-output/planning-artifacts/prds/prd-crank-2026-08-03/prd.md
_bmad-output/planning-artifacts/architecture/architecture-crank-2026-08-03/ARCHITECTURE-SPINE.md
_bmad/tea/config.yaml
2026-09-13

Epic 4 test design progress

Output: test-design-epic-4.md. Completed 2026-09-13. Story/requirement/AC-count coverage, source references, risk scores and format validated. Template adapted to existing-project inventory: counts are scenario seeds, estimates are provisional QA deltas, no synthetic code-coverage or execution claim. Native loop ATDD is post-dev; pre-implementation customization is a separate pending approval, not executed by this design run.

Coverage decisions

10 story families, two independently assertable scenario seeds per family (A positive contract; B rejection/fault). Former 4.5 splits into input (4.5) and reconciliation (4.6); former Admin UI splits into basic Task UI (4.8) and input/reconciliation UI (4.9). All owning-story Given/When/Then groups remain required ATDD input; these are not a claim of exhaustive implemented test cases.

Scope: FR-21–FR-26; system families CP-12..15. Lowest effective level assigned per family. P0 security/data integrity with no workaround; P1 user/core flow. No speculative mandatory P2/P3 additions.

Source reuse: crates/crank-runtime/tests/{stages,product_metrics}.rs, crates/crank-runtime/tests/integration/{idempotency,confirmation,valkey}.rs, crates/crank-test-support/src/lib.rs supply synchronous safety and real-PG fixture patterns.

Gaps: No durable Task/worker/admission lifecycle tests found in main. tokio::task usage is not MCP Tasks coverage. All story-specific Task acceptance scenarios are planned. Existing synchronous idempotency and approval tests must remain regression coverage, not be rewritten to make unsafe Task behavior pass.

NFR: 128 concurrent sync/background executions, up to 10,000 queued; start and steady queue wait p95 ≤5 s within service rate, oldest age ≤30 s; 10k backlog drains ≤60 minutes after overload ends. Shutdown ≤30 s and eligible lease recovery ≤60 s. Fencing protects Crank state, not exactly-once external side effects.

Fixtures: Real PG independent worker connections; controllable clock/barriers and crash checkpoints before/after commit, claim, dispatch, side effect and terminal commit; counted upstream with and without verified idempotency; Valkey-off fixture; separate measured capacity host.

Execution: PR functional tests, nightly bounded expensive/fault work, weekly calibrated qualifications; scheduled tiers are planned, not configured. Mandatory story ACs still must pass before acceptance, regardless of tier. 72h/30day release windows only in Epic8. QA effort assumption with prerequisite implementation ready: P0 64–128h; P1 20–40h; optional P2 0–8h/P3 0–4h; total 84–180h (~3–5 contributor-weeks). Not a backlog of compulsory new tests; refine against existing-test reuse during ATDD.

Risks and NFR planning

Risk Category Failure P I Score System risk Mitigation / owner / deadline
E4-R1 DATA Stale lease or retry duplicates an external side effect 3 3 9 R-003 Fencing + side-effect counters + unknown outcomes; Task owner, 4.3–4.6
E4-R2 PERF Admission/queue exhaustion starves control plane 3 3 9 R-006 Limits/fairness/recovery under load; Performance, 4.10
E4-R3 SEC Cross-scope Task control or resume bypasses consent 2 3 6 R-004 Owner-bound cancel/input/reconciliation; Security, 4.5–4.9

Scores describe inherent risk, not observed failures or a release verdict. Security/reliability/performance thresholds inherit the system design and owning story ACs; missing environment/measurement evidence remains explicit, never inferred PASS.

Context: Rust/PostgreSQL + browser JavaScript fullstack. Existing test source inventory at main 083974c; f8ee7c9 candidate is separate. Browser CLI absent; no live exploration, no fabricated evidence. Playwright/Pact utility flags are intentions only: packages absent; no library migration or Pact scaffolding in this planning scope. Required risk, probability/impact, test levels/priorities and NFR knowledge loaded; concrete source reuse and gaps appear in the epic plan.

Explicit batch request, independent epic scope. Requirements and acceptance criteria: planning-artifacts/epics.md, Epic 4. System designs already updated; no product implementation or test execution authorized by this planning run.