runScope, runKey, workflowStatus, workflowType, totalSteps, stepsCompleted, lastStep, nextStep, lastSaved, auditedRevision, inputDocuments
| runScope | runKey | workflowStatus | workflowType | totalSteps | stepsCompleted | lastStep | nextStep | lastSaved | auditedRevision | inputDocuments | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| epic-level | epic-7 | completed | testarch-test-design | 5 |
|
step-05-generate-output | 2026-09-13 | 083974c27f |
|
Test Design: Epic 7 — Автономное production-развёртывание и восстановление
Date: 2026-09-13
Author: Bsodfather / BMad TEA
Status: Updated planning baseline; qualification not evaluated.
Executive Summary
Scope: FR-41–FR-45, 9 stories, system scenario families CP-25..27. This plan refines the current system design; it neither changes approved product scope nor marks stories complete.
3 inherent risks, 3 high (score ≥6). Coverage seeds: 16 P0 and 2 P1 independently assertable scenarios. Counts describe the two seeds per story below, not implemented tests, coverage percentages or the eventual parameterized case count. Every source AC remains mandatory.
Existing Coverage and Evidence
Source inventory at main 083974c: crates/crank-config/tests/{contract,generation,redaction}.rs; crates/crank-registry/tests/integration/migrations.rs and migrations/; apps/admin-api/tests/migration_command.rs; apps/admin-api/tests/config_startup.rs; scripts/restore-community.sh; scripts/authenticated-product-smoke.py; .gitea/workflows/ci.yml.
Config/migration/auth foundations and Compose authenticated smoke exist. Restore script presence is not three qualified PITR restores. Complete offline signed bundle, role isolation with future worker/runner and full N/N-1 online/offline matrix need evidence. Prior deployment failures require regression fixtures for legacy fingerprint, missing core, external PG topology and failed migrate diagnostics, not permission to reset databases.
Source presence ≠ execution ≠ requirement coverage ≠ qualification. No product test, deployment or load execution was performed for this plan. Reuse source tests only after matching their oracle to the current AC and recording a run on the candidate under test.
Not in Scope
| Item | Reason | Mitigation |
|---|---|---|
| Unrelated future-epic implementation and whole-product refactoring | This is Epic 7 test planning | Keep explicit prerequisites below; do not invent additional story acceptance |
| SSO/RBAC enterprise features, non-REST adapters, HA/rolling deployment | Outside approved Community scope | Preserve Community boundary checks |
| Declaring current production readiness from source inventory | No bound qualification run | Require real evidence before gate |
| Product-wide 72-hour soak / 30-day burn-in | Owned by Epic 8 | Component fault/performance obligations in this epic remain required |
Risk Assessment
Score = probability × impact on a 1–3 scale. Score ≥6 needs verified mitigation; 9 is an unresolved critical release risk, not a command to implement every mitigation immediately. Categories: SEC security, DATA integrity, OPS operations, PERF performance, BUS user behavior, TECH architecture/testing.
| Risk ID | Category | Failure | P | I | Score | System risk | Mitigation / accountable role / deadline |
|---|---|---|---|---|---|---|---|
| E7-R1 | DATA | Schema/artifact/key mismatch destroys recovery | 2 | 3 | 6 | R-008 | Manifest + N/N-1 + three real restores; SRE, 7.8–7.9 |
| E7-R2 | SEC | Unsafe defaults/proxy/privileges expose installation | 2 | 3 | 6 | R-007 | Fresh-host negative exposure tests; Security, 7.4/7.6 |
| E7-R3 | SEC | Offline bundle untrusted or phones home | 2 | 3 | 6 | R-014 | Offline signature/tamper/egress tests; Release, 7.5 |
Medium risks: shared R-012 (4), deterministic test isolation; QA owns continuous monitoring. No additional low risk is invented just to fill a template. Residual risk is unmeasured until evidence exists.
NFR Planning
Each of3independent restores RPO≤5m/RTO≤30m with real MCP probe; drain≤30s and eligible Task recovery≤60s. Production sizing retains≥30% measured headroom. Zero known Critical/High, zero unapproved egress. Trust material/reference-host allocation and exact image digests are execution prerequisites, never generated secrets in docs.
| Category | Scenario linkage | Planned validation / evidence |
|---|---|---|
| Security/privacy | SEC risks and B scenarios below | Scope/abuse/canary tests, bounded sanitized logs and network/scan report |
| Reliability/data integrity | DATA/OPS risks and fault scenarios | Real authority/state assertions, fault schedule and reconciled counters/digests |
| Performance/scalability | Numeric epic obligations above | Calibrated raw latency/resource samples, achieved load and immutable config/topology fingerprint |
| Maintainability/compatibility | Every changed component | Existing just verify/UI gates as applicable, schema/contract diffs and traceable regression reports |
Unknowns: exact execution hardware and fresh qualification artifacts are not available from this audit. Where the owning story requires a new tolerance, limit or version selection, freeze it in its approved contract before writing a numeric assertion; never replace the PRD threshold with a guessed easier value. Full NFR verdict belongs to bmad-testarch-nfr after execution.
Entry Criteria
- Approved owning story/spec and prerequisites are available in the same worktree.
- ATDD loads the actual ACs from
epics.md/ selected spec and the system QA design. - Existing tests and baseline failures are inspected before adding tests; no duplicate test suite solely for new IDs.
- Disposable fresh host/network namespaces; PG16 current/N-1/legacy snapshots; checksummed artifacts/WAL plus out-of-band test keys; fault checkpoints; offline registry-less image archive; default-deny egress capture; fresh scanner DB pinned in report.
- Missing fixture, service or approval is reported as blocked/not-run, not silently skipped.
Test Coverage Plan
P0/P1/P2/P3 indicate priority, not execution timing. Each table row has two separate scenario seeds: <Story>-<Level>-A and ...-B. Split a seed when independent assertions require different fixtures. Reuse an existing equivalent test rather than duplicating it; ATDD records exact test name/path and AC mapping.
The AC-count column inventories all Given groups under that source story, not a claim that two tests exhaust those groups. The former offline-upgrade acceptance group moves from 7.5 to 7.9: 7.5 remains bundle creation/install trust coverage, while 7.9 owns upgrade/rollback continuity. ATDD must map each group (story + ordinal + quoted acceptance text) to existing test, new test, or explicit not-run prerequisite before implementation. The approved spec controls finer-grained cases.
P0 — Critical
Security, irreversible data integrity and false acceptance have no safe user workaround.
| Story / scenario IDs | Requirements | AC groups | Primary level | Risk | A: expected behavior | B: rejection / fault |
|---|---|---|---|---|---|---|
| 7.1 / 7.1-UNIT-A,B | FR-45 | 6 | UNIT | E7-R2 | Typed schema generates matching examples/Compose/docs/redacted effective config | Unknown/unused/divergent/unsafe cross-field and conflicting alias values fail safely |
| 7.2 / 7.2-INT-A,B | FR-43 | 6 | INT | E7-R1 | Fresh/current/N-1/legacy PG16 states migrate idempotently through canonical authority | Checksum/future/partial drift and concurrent preflight reject before mutation; large backfill resumable |
| 7.4 / 7.4-API-A,B | FR-41 | 6 | API | E7-R2 | Explicit TLS/origin/host/trusted proxy and separate Admin/MCP/metrics identities work | Spoofed forwarded headers, host/CORS/CSRF/cookie downgrade and exposed recovery denied |
| 7.5 / 7.5-SYS-A,B | FR-42 | 5 | SYS | E7-R3 | Signed digest-pinned complete bundle installs with default-deny egress | Extra/missing/tampered/unpinned artifacts or invalid trust fail offline; no CDN/registry/phone-home |
| 7.6 / 7.6-SYS-A,B | FR-44 | 7 | SYS | E7-R2/E7-R3 | Images enforce role-scoped non-root/caps/read-only/resource/mount policy and≤30s drain | Runner cannot access DB/secrets; OOM/disk pressure isolated; changed hardened image invalidates and rebuilds bundle |
| 7.7 / 7.7-INT-A,B | FR-43 | 6 | INT | E7-R1 | Online consistent WAL/artifact/config cut produces immutable complete BackupManifest | Interrupted backup/missing WAL/wrong epoch/tampered bytes never become usable; retention keeps pinned dependencies |
| 7.8 / 7.8-SYS-A,B | FR-43 | 6 | SYS | E7-R1 | Three independent fresh-host restores prove RPO/RTO and real authenticated MCP plus key recovery | Mismatch blocks mutation; ciphertext/manifest errors explicit; crash during re-encryption preserves decryptability |
| 7.9 / 7.9-SYS-A,B | FR-43 | 8 | SYS | E7-R1 | N-1→N preflight/backup/drain/migrate/probe preserves pinned state online and through the transferred offline-upgrade path | Fault before reversible boundary rolls back safely; irreversible boundary requires explicit manifest restore |
P1 — High
Core user journeys and complex integrations; limited workaround, not relaxed acceptance.
| Story / scenario IDs | Requirements | AC groups | Primary level | Risk | A: expected behavior | B: rejection / fault |
|---|---|---|---|---|---|---|
| 7.3 / 7.3-SYS-A,B | FR-41 | 6 | SYS | E7-R2 | Fresh minimal/production profile starts, persists, restarts and makes real MCP call; PG-only correct | Missing secrets/unsafe exposure fail readiness; optional backend outage cannot pretend safety store is optional |
P2 / P3
No additional mandatory scope. Optional focused exploratory/cosmetic variants may be recorded later with owner and justification; they do not become an endless implementation/review queue.
Levels: UNIT pure contract/model; INT real filesystem/database/runtime boundary; API actual handler/protocol; E2E critical browser journey; SYS isolated full-stack qualification; MANUAL named human protocol. Use unit cases for algorithms, real PG for transaction/fencing, wire fixtures for protocol, browser only for user-visible interaction. Intentional defense-in-depth checks different failure surfaces, not identical duplicated assertions.
Execution Strategy
Run all functional tests in PRs when they fit the target 15-minute feedback window; defer only expensive infrastructure/duration, not inconvenient failures. Current Playwright is Chromium, one worker: parallelization is a future isolation-dependent optimization, not a current claim.
- PR: changed functional/negative regressions and boundary suites; applicable Rust/tooling/config and UI gates.
- Nightly: bounded fault/contention, repeated isolation and resource trend tests after the required seams exist.
- Weekly: calibrated production-size performance, fresh-host/offline/recovery and manual qualification as applicable.
- Epic / RC acceptance: every mandatory AC and quantitative obligation must have exact-candidate evidence, even if its normal execution tier is weekly. Epic 8 owns the immutable long-duration release windows.
Nightly/weekly scheduling is a proposed execution model; the current Gitea pipeline has PR/push and release jobs, not those schedules. This planning task does not create them. just verify does not replace Playwright, deployment/image or qualification jobs.
Resource Estimates
Incremental QA test/evidence effort with working production seams and reusable fixtures, excluding feature implementation, provisioning lead time and unaccelerated duration. Low-confidence planning ranges, not token budgets or compulsory numbers of new tests; reassess at each story ATDD after deduplication.
| Priority | Estimated effort |
|---|---|
| P0 | 48–96 hours |
| P1 | 16–32 hours |
| Optional P2 | 0–8 hours |
| Optional P3 | 0–4 hours |
| Total envelope | 64–140 hours, approximately 2–4 contributor-weeks |
If a measurement environment is missing, report the prerequisite; do not run large workloads opportunistically inside a story session.
Exit Criteria and Quality Gates
- P0 pass 100%; P1 ≥95% is an interim development signal only, 100% of mandatory P1 and manual ACs must pass for acceptance.
- Every owning-story AC has test/protocol plus bound execution evidence; no mandatory skipped/flaky/blocked/not-run item becomes pass.
- No unresolved Critical/High defect; high-risk mitigation verified on the owning scenario before release. Mandatory Habr conditions have no waiver.
- Coverage targets remain system planning goals (80% workspace /90% new critical code where measured); no coverage report currently proves them. Scenario counts do not substitute for coverage instrumentation.
- NFR evidence names revision, config/topology, tool/data versions, command, seed, timestamps, raw sanitized output digest and result.
- Story completion follows its spec, not all remaining epic/system gaps; no automatic reopening of done stories.
Mitigation Plans
Each high-risk owner in the matrix: (1) implement/reuse the production-safe seam; (2) run its A/B and detailed AC cases with controlled failures; (3) bind the output to the candidate; (4) re-evaluate residual risk. Status is planned or source-partial, never verified solely by this document. Required completion time is the owning story/epic milestone in the risk table. No generic follow-up review loop is created.
Assumptions and Dependencies
All shipped processes/config/metrics contracts from preceding epics. 7.1/7.2 preflight → profiles/exposure/bundle/hardening; 7.7 complete manifest →7.8 restore→7.9 upgrade. 7.6 image changes require7.5 bundle requalification.
Accountable roles are responsibilities, not claims of staffed teams. Reference hardware, operator credentials and manual reviewers must be assigned before relevant qualification. Use disposable fixtures while waiting; lack of resources blocks the affected evidence, not permission to mutate a live deployment.
Interworking and Regression
Affected components and reusable suites are named in Existing Coverage. Preserve existing REST→MCP, auth/credential/approval, config/migration, correlation and Community-boundary behavior whenever those shared contracts change. Frontend failures need actual browser regression; registry races need real-PG assertions, not UI mocks.
ATDD Handoff
For the selected not-yet-implemented story only, load this plan and the exact approved spec; freeze its finite AC-to-test checklist before implementation. Prefer existing Rust/PG/Playwright patterns, add only uncovered acceptance scenarios and reproduce RED for missing behavior without artificial failure. Existing correct behavior may already be GREEN: record it honestly. Resume matching incomplete ATDD, reuse completed matching checklists and update only changed ACs. Do not invoke whole-epic automation on each review.
Automatic pre-implementation ATDD requires the project build-auto handoff override; the stock bmad-loop0.11.1 TEA ATDD injection is post-dev and is not that sequence. Loop configuration is separate from completion of this plan. The design workflow itself does not run ATDD or product implementation.
References and Validation
- Epic/AC source:
_bmad-output/planning-artifacts/epics.md, Epic 7. - System contract: architecture, QA inventory and execution.
- Normative PRD and architecture spine: frontmatter inputDocuments.
- TEA knowledge: risk-governance, probability-impact, test-levels-framework, test-priorities-matrix, nfr-criteria.
- Utility integration: Playwright/Pact flags are true but packages absent. No imports, framework migration or Pact service are generated. Browser CLI unavailable; source-based design only.